Reports and Supporting Documentations for the 48-Bed Residential Treatment Facility in Clark County

 

DSHS completed construction of the Brockmann Campus in 2025.  As a part of the Clark County conditional use permit process prior to construction, DSHS submitted documentation including development plans, landscape plans, a storm water plan, water and sewer service reviews, a traffic study, a topographical survey, and other documentation. These documents are linked below with more details about our proposal.

Clark County development application

Email re Road modification request

Submittal checklist

Pre-application final report (version 1)

(original plan to build on west end of property)

Pre-application final report (version 2)

(current plan to build on east end of property)

Developer’s geographic information system packet

Project narrative

Responses to criteria

Boundary line adjustment approval

Building elevations

Building plans

Landscape graphic

Landscape plans

Proposed development plans

Soils analysis geotechnical engineering report

Preliminary stormwater design report

Groundwater mounding memorandum

Traffic study

SEPA environmental checklist

Sewer purveyor utility review letter

Water purveyor utility review letter

Public health review letter

Boundary and topographic survey

Archaeological predetermination (partial report)

Title report

Wetland jurisdictional determination

Wetland county determination